• Xuchang biogas power generation and biogas desulfurization project
  • Purpose:

    Gas Source:

    Location:

    Capacity:

    Work Scope:

  • 三期必中一肖
    • DESCRIPTION

      图一:沼气发电机组

      图二:干法脱硫塔

       
      Introduction
      The construction of Xuchang biogas power generation is approved by the National Tobacco Administration, with a total investment of 250 million yuan in the first phase of the project. In accordance with the overall requirements of safety, energy conservation, environmental protection, and emission reduction, it aims to create a nationally renowned tobacco flake research and production base.
       
      In 2008, we collaborated with Zhongtuo to assist in the construction of biogas power plants and supporting desulfurization systems.
    三期必中一肖

    截屏,微信识别二维码