三期必中一肖
  • Shandong Refining and Chemical Gas Power Generation Project 4 × 500kW
  • Purpose:

    Gas Source:

    Location:

    Capacity:

    Work Scope:

  • 三期必中一肖
    三期必中一肖
    • DESCRIPTION
      三期必中一肖
      三期必中一肖
      三期必中一肖
      三期必中一肖

      Introduction
      The refining tail gas generator set uses natural gas as fuel, which is processed by a catalytic cracking unit and a hydrofining unit to produce combustible gas, and then driven by a gas turbine to drive the combined cycle system of the generator set. This unit has advantages such as low investment, low operating costs, and low pollution. At present, China is vigorously promoting the use of this technology.
    三期必中一肖

    截屏,微信识别二维码